Skip to content

FAQs

Block Paving Removal & Resin Replacement Questions

Every question we get asked about block paving removal & resin replacement, answered straight.

Questions

Problems & Symptoms

  • Will resin help with weeds and loose joints?

    Yes. Resin bound surfacing is laid as a continuous, jointless layer, so there are no gaps for weeds to root in. Block paving joints are the main entry point for weeds and the first thing to loosen over time. Removing the blocks and replacing with resin eliminates both problems at once.

Questions

Cost & Pricing

  • What does the quote cover when the old blocks need taking out first?

    The quote covers excavation, sub-base work, drainage and the resin bound finish as separate line items, so you can see what each element costs. £5,000-£6,500 is the typical range for a full removal and replacement, varying with driveway size and the condition of the existing base.

  • Can I get a quote before the old surface is lifted?

    Yes. A specialist assesses the base condition from the surface before quoting, so you receive a detailed, itemised figure before any work begins. If lifting reveals unexpected sub-base problems, those are quoted separately before the work continues, not added to the bill afterwards.

Questions

Is It Right for You?

  • Can my block paving be removed and replaced with resin?

    Yes, block paving can be lifted and replaced with a resin bound surface. The existing blocks are excavated, the sub-base is assessed and repaired where needed, and a fresh resin bound finish is laid on top. Most driveways are suitable, though the condition of the base underneath determines how much preparatory work is required.

  • Will my driveway be level and strong enough for cars after the work?

    Yes, provided the sub-base is correctly compacted and the resin is laid to the right depth. A properly prepared resin bound surface handles standard domestic vehicle loads without issue. The sub-base assessment before work starts confirms whether the existing foundation needs reinforcing to meet that standard.

  • Is resin the right choice for a rough or tired driveway?

    Yes, if the sub-base beneath is sound. Resin bound surfacing gives a smooth, consistent finish over a properly prepared base, which is exactly what a worn or uneven driveway lacks. The key step is confirming the base is worth building on before committing to the surface material.

  • How do I know if my driveway is suitable for resin replacement?

    A local specialist will assess the existing surface and sub-base before providing a quote. They check base depth, drainage, falls and any structural issues. That assessment tells you whether a straightforward replacement is possible or whether additional groundwork is needed first.

  • Will this improve drainage as well as the look of the drive?

    Yes. Resin bound surfacing is permeable, meaning water drains through the surface rather than running off it. Replacing block paving, which loses permeability as joints fill with debris, with a fresh resin bound surface restores proper drainage across the whole area. See more about permeable options.

Questions

Comparing Your Options

  • Do the old blocks need to come up, or can the resin go over them?

    It depends on the condition of the existing surface. If the blocks are stable, level and well-bonded, a resin overlay may hold. If they are loose, sunken or cracked, lifting them is the safer route. A local specialist will assess the base before quoting, so you get the right recommendation rather than a guess. Learn more about overlays.

  • Can the old blocks be reused instead of being thrown away?

    Lifted blocks can sometimes be reused elsewhere, for a garden path, raised bed edging or a rear yard surface. They cannot go back under resin, as the irregular bed they leave behind would undermine the new surface. Whether they are worth keeping depends on their condition after lifting.

  • Is a resin replacement better than repairing the block paving I already have?

    For a driveway with widespread settlement, weed growth or failing joints, replacement tends to outlast repeated repairs. Patching block paving addresses symptoms without fixing the underlying base movement. Resin replacement, done with a properly rebuilt sub-base, gives a fresh start rather than another short-term fix.

  • Is resin replacement better than keeping block paving on a site with wet periods and surface water issues?

    Yes, in most cases. Block paving with silted joints sheds water rather than absorbing it, which worsens surface pooling over time. Resin bound surfacing is permeable and drains water through the surface directly, reducing runoff. Pairing it with a correctly graded sub-base addresses standing water more effectively than patching existing block paving.

Questions

How It Works

  • Will the base underneath need extra work before the resin goes down?

    Often, yes. Once the blocks are lifted, the sub-base is inspected for soft spots, settlement or poor drainage. Any weak areas are excavated further and rebuilt before the resin is laid. Skipping this step is the most common reason resin surfaces fail early, so it is not something to cut corners on.

  • What should be checked before the new surface is laid?

    The sub-base depth and compaction, any drainage runs or gullies, the fall of the surface away from the property, and whether any edging restraints need replacing. Each of these affects how the finished resin performs over time. A site assessment before work begins covers all of these points.

  • How much of my old driveway will actually be removed and replaced?

    In most cases the full surface area is lifted. Partial removal tends to leave inconsistent base depths, which causes the finished resin to settle unevenly. If only a section is genuinely failing, a specialist can advise whether a targeted repair makes sense, but a full lift is the standard approach for a replacement job.

  • How long will I be without a usable driveway?

    Resin bound surfaces are typically walkable within 24 hours and ready for vehicles within 48 to 72 hours of laying. Add the time for excavation and any sub-base repairs, and most jobs mean two to four days without full use. Your installer will give you a specific timeline once the scope of work is confirmed.

  • Do I need to clear the driveway before the work starts?

    Yes. Vehicles, bins, planters and any loose items should be moved off the driveway before the crew arrives. Access to the site needs to be clear from the start so excavation can begin without delay. Your installer will confirm exactly what needs to be cleared when they confirm the start date.

  • Will the finished surface be easy to keep clean and tidy?

    Yes. Resin bound surfaces have no joints to trap moss or debris, so a periodic rinse with a garden hose or a gentle pressure wash keeps them looking tidy. There are no individual blocks to shift or re-sand, which removes the main maintenance task that block paving requires year on year.

  • How is the old driveway prepared before resin goes down?

    The blocks are lifted and removed, the sub-base is inspected and any soft or uneven areas are excavated and rebuilt. Edging restraints are checked or replaced, drainage falls are confirmed, and the base is compacted before the resin bound layer is mixed and laid. Each stage is completed before the next begins.

  • After block paving is removed, will resin replacement need new drainage work in Peterborough?

    Not always, but drainage is checked as part of the pre-quote assessment. If existing gullies or channels are blocked, damaged or in the wrong position for the new surface falls, they are quoted as a separate line item. Peterborough’s flat terrain means surface water management is worth confirming before the resin goes down.

  • Can old block paving be removed and replaced with resin?

    Yes. The blocks are lifted, the base is inspected for movement and drainage, and any repairs are completed before the resin bound aggregate surface is installed. The key step is confirming the base is sound before anything new goes down.

  • Do the old blocks just get covered over?

    No. Covering a failing surface leaves the same sinking and cracking problems underneath. The blocks and jointing material are fully removed so the base can be properly inspected and, where needed, rebuilt before the resin is laid.

  • What happens if I delay replacing a cracked or sinking driveway?

    Ground movement continues beneath the surface. Sinking patches deepen, edges break away, and drainage worsens. The longer the sub-base is left in a failed state, the more repair work it is likely to need before a new surface can go down.

  • What is checked before the resin surface is installed?

    The sub-base is checked for compaction, drainage performance, and level. If the ground has moved or the base is weak, that is repaired first. Drainage falls and edge restraints are also set correctly as part of the new build-up.

  • Will a resin surface stop weeds coming back?

    A resin bound surface removes the open joints where weeds take hold. The permeable, trowelled finish leaves no gaps for weed growth and requires no re-sanding or re-jointing to maintain.

  • How is the cost broken down?

    Every quote lists block paving removal, sub-base inspection and any repair, drainage, and the resin bound finish as separate line items. You see exactly what each element costs before agreeing to any work.

Questions

Guarantees & Peace of Mind

  • What happens if the old base is not good enough once the blocks are lifted?

    The sub-base is excavated further and rebuilt to the correct depth and compaction before any resin is laid. This is quoted as a separate line item, so you can see exactly what the additional work costs. Laying resin over a weak base is not something a reputable installer will do, as it causes early failure.

  • Will the new resin surface crack if the old driveway moves underneath?

    A resin bound surface laid on a stable, well-compacted sub-base will not crack under normal movement. If the base shifts significantly due to poor compaction or tree root activity, any surface will be affected. That is why the sub-base is assessed and repaired before the resin goes down, not after.

Tell Us About Your Driveway

We arrange a local resin specialist to assess your sub-base and provide an itemised quote before any work is agreed.

Request a Survey